About company

1971

An engineering team is formed for the construction and management of “Metallist” factory as a part of the Ministry of Agrarian Policy and Construction of the Ukrainian Soviet Socialist Republic.

1975

Stage I – commissioning of the facilities (20 000 m2) for the production of reinforced concrete structures with a capacity of 8 000 tons per annum.

1978

Stage II – commissioning of the industrial area (45 600 m2) for the production of modular buildings with annual capacity of 57 600 m2 and metalware specialized equipment with a capacity of 1 200 tons per annum.

2004

Launch of the trademark BLOCKMASTER.

2006

The Company’s in-house technical laboratory is certified, international Quality Management Standards are implemented and ISO-9001 certification is obtained.

2008

The Company reaches its highest production capacity in the new history of independent Ukraine.

2012

First EBRD-financed industrial Solar Power Plant is built and commissioned.

2018

The Company increased its in-house capacities of steel mounting structures production and turn-key construction of SPPs up to 200 MW per year.